Beyond Surveying and Engineering

[ Back to Water Resources Portfolio ]

Whitnall School District Athletic Fields/Stormwater Study - Greenfield, Wisconsin


Whitnall High School and Middle School Storm Water Study - Greenfield, WisconsinR.A. Smith National recently completed the site design for the renovation of this secondary education campus and its athletic facilities. Services provided included site planning, civil engineering, land surveying, ecological, water resources and irrigation design services associated with student parking lot renovations, new staff parking lot, tennis courts, natural turf sports fields for baseball/softball/soccer, synthetic turf football field, running track, bleachers, concession building, restrooms, sanitary grinder station and storm water management facilities. R.A. Smith National also coordinated submittals to city and state review agencies which included U.S. Army Corps of Engineers and Wisconsin Department of Natural Resources permitting associated with the adjacent wetland and waterway.

Stormwater Study
R.A. Smith National completed a preliminary engineering study for the Whitnall School District that addressed stormwater management at the Whitnall High School site and the north end of the Whitnall Middle School site. The purpose of the study was to identify deficiencies in the existing stormwater drainage system and provide potential solutions that are compatible with future site improvements. The stormwater problems and concerns identified by the District included ponding water, poor drainage, and runoff from adjacent properties onto District property. In addition to conceptual solutions for the problem areas, guidance was provided regarding local, state and federal permits required for possible construction.


[ Back to Water Resource Portfolio ]

  Share this:         Copyright R.A. Smith National, Inc., 1997-