Project Overview
raSmith provided construction services for this $6.1 million, multi-phase bridge rehabilitation that included the reconstruction of three new bridges over the Bark River, one deck replacement over the Fox River, and the resurfacing of 4.3 miles of US 18. The project was located in the village of Dousman, village of Summit, and the city of Waukesha. The work included: grading, base, asphalt and concrete pavement, storm sewer, curb & gutter, sidewalk, guardrail, chain link fence, signing, rumble strips, and pavement markings.