Laimon Family Lakeside Park Improvements

Pewaukee, WI

Project Overview

In March of 2019, the Village of Pewaukee, through its Pewaukee Park and Recreation Department, requested that raSmith prepare a master plan for improving the urban park located at 129 Park Avenue. Desired improvements included rehabilitation of the parking lot (which included removal of a large WE Energies transformer and power poles in the middle of the lot), removal of the existing launch and replacement with a wider launch, addressing several on-site drainage issues and developing additional green spaces. Our services included a full survey of the property, development of a site plan and grading/drainage plan, addressing existing ponding areas and ineffective storm sewer inlets in the parking lot, designing curbs and gutters to protect green areas and the existing bait shop, project coordination, project estimates, permitting, electronic bidding and construction-related survey and inspection services. The Park and Recreation Director prepared a grant application with raSmith technical assistance, cost estimates and peer reviews.

Project Gallery

Related Markets

Related Services


Related Projects