Explore Projects

Search

Markets

Services

Cedarburg, WI
The Town of Cedarburg reconstructed Columbia Road from Bridge Road to west of 1st Avenue, providing a two-lane undivided cross-section with on-street bicycle accommodations, sidewalk facilities, and curb & gutter.
Kenosha County, WI
From a new storm sewer system to traffic signals, this reconstruction project presented a variety of challenges for which raSmith provided creative solutions.
Delafield, WI
raSmith provided land surveying, site planning, site design, civil engineering, traffic and parking studies, and landscape architecture for Delafield, Wisconsin's first mass timber development, The Grain.
raSmith took on the roles of both the engineer of record and the specialty engineer for the 481,933-square-foot Highland Commerce Center in Fort Myers, FL.
From the pavement to pedestrian accommodations, this reconstruction project improved the overall operations and safety of Durand Avenue.
Village of Twin Lakes, Kenosha County, WI
The CTH EM highway resurfacing project provided a widened paved shoulder that would vary in width throughout the corridor and provide a buffer between pedestrians and vehicles in the Village of Twin Lakes, WI.
When this intersection experienced safety issues, raSmith was selected to design the solution—a single-lane roundabout that limited impacts to surrounding areas and reduced construction costs.
raSmith provided transportation and traffic engineering services for this single-lane roundabout to improve safety and operations.
Construction inspection including traffic control monitoring played an important role to keep this resurfacing project on schedule.
Milwaukee, WI
raSmith provided cold-formed steel (CFS) design for the exterior non-load-bearing walls and soffits, as well as the interior load-bearing mezzanine framing at the loading dock for The Trade Hotel in Milwaukee.