Project Overview
raSmith’s team designed and provided construction services for this 550 gpm firm capacity lift station and an associated one-half mile of six-inch force main for a new industrial development in the Village of Pleasant Prairie along 120th Avenue. The lift station facility includes a brick utility building, MCC controls, standby generator, portable generator connection, and 10-foot diameter precast wet well structure. Its submersible electric pump motors operate at 34 HP, 480 volts, 3 phase service. Construction was completed in 2020.