Project Overview
The Village of Mount Pleasant had a large amount of undeveloped land along the well-traveled WIS 20 corridor. In 2006, the Village created Tax Incremental District (TID) No. 1 (495 acres), with the goal of developing the land along WIS 20 that stretches west to IH-94.
raSmith has been working with the Village, providing civil design and construction administration services for the business park. We designed a new north-south 1,800-linear-foot divided urban roadway extension and associated storm sewer, water main and sanitary sewer needed. Sanitary sewer and water main were extended by 2,900 feet through the site’s proposed Kilbourne Drive. Permitting included WDNR stormwater and erosion control, wetland fill, sanitary and water extension, and WisDOT right-of-way.
Particular attention was required for the Aurora Health Care hospital’s helipad and its helicopter arrival and departure zones. Proposed lighting and landscaping within the public right of way were adjusted based on these zone requirements, which then required additional attention to the proposed storm sewer.